WaveLine® Display 10ft S-Curve
$1023 - Single Sided
$1511 - Double Sided
This tension fabric display is a great alternative to standard pop up back wall displays. Lightweight aluminum poles with bungee cord snap together to create the base framework, then slide on the pillowcase-like graphic over the frame and zip it closed at the bottom. The zipper is hidden from view and tightens up the stretched fabric graphic for a smooth image. Single or Double-sided.
Kit Includes
- (1) 4x3 Frame Curve - 1-1/4" (32mm) cold-drawn anodized aluminum
- (1) Travel bag - made from 100% recycled materials
- (1) Graphic Print - recyclable polyester stretch fabric, vibrant, wrinkle-resistant
- Single or Double-sided available.
Add-on Accessories
- WLM LED Light
- WLM Counter
- WLM Triangular Shelf
- WLM CA700 Case with Counter Conversion
Specifications
- Display Size: 118"W x 88" H
(2998mm W x 2260mm H) - Shipping Size: 13.8"W x 12.4"D x 32.1"H (350mm W x 315mm D x 815mm H)
- Material: Dye-sublimation Stretch Fabric
- Carton Weight: 7.2kg,15.9lb
- Graphic Weight: 3.6kg,7.9lb
- Warranty: One (1) year on hardware and graphics.